Indian Railways with its vast tracks network has been The World's biggest Mobile Toilet
60% (626 million) in India do not have toilet
This makes India the number one country in the world where open defecation is practised
Indonesia with 63 million is a far second!
Less than 10% of Gram Panchayats in India are ODF
Indonesia with 63 million is a far second!
Less than 10% of Gram Panchayats in India are ODF
ØPollution of fecal matter with
drinking water leads to contamination of food, fruits & vegetables, animals
(direct contact, flies & rodents)
ØWater
borne diseases
ØViral
gastroenteritis
ØTyphoid
ØCholera
epidemics
ØDiarrhoea (annually kills 5 Lakhs children)
ØViral
hepatitis (100 cases per 100,000 people)
ØOrganic
pollution
ØAesthetic
nuisance
Controlled Discharge
Toilet System (CDTS)
LHB coaches are
fitted with controlled discharge toilet units to avoid soiling of train in
station and inhabited areas.
The toilet system is designed to
operate with a pressurized water bowl wash that covers 100% of the toilet bowl
area. The waste is removed from the toilet bowl and transferred to a retention
tank with a minimal amount of water. Water consumption is only 2.5 liters per
flush cycle for the Indian style toilet bowl and
1.5 liters for the European
style toilet bowl.
The abstract phenomenon of this system is to operate the valve of the toilet in accord to the speed of the train. The train while entering a station subsequently reduces its speed to halt. The valve of the is operated by electric controls and pneumatic cylinder which is closed below 30kmph (estimate). At higher speed above 30kmph the valve would open discharging the waste.
Operating Principle of CDTS
Ø This system works on electrical & pneumatic pressure arrangement. The
retention tank stores effluent has two openings. These two openings activates
by double acting pneumatic cylinders fed by Feed pipe of air brake system with
the help of electromagnetic solenoid valves.
Ø The system starts working on a single push of flush switch. As the flush
switch is pressed, water flows into the toilet bowl & the upper slide valve
opens which is connected between the toilet bowl & retention tank. All the
toilet waste is transferred into the retention tank. At the end of each flush
cycle the supply of water is stopped & the upper slide valve is closed.
Thus, the toilet is sealed from the retention tank, preventing odor entering
from the toilet room.
Ø The waste accumulated in the retention tank remains in the retention tank
until two parameters are satisfied.
Ø A predetermined no. of flush counts, &
Ø The train is reached a predetermined speed.
Ø As soon as these above two parameters are met, the lower slide valve of
retention tank opens & the toilet waste accumulated in the tank is
discharged out of the tank to the rail side, away from the station & city.
Ø The lower slide valve of the retention tank remains open for only small
period of time to empty the retention tank. The lower slide valve then remains
closed until the above discharge parameter conditions is again satisfied.
Salient Features
Ø Programmable.
Ø Requirement
of less Air and Water.
Ø P.L.C
Controlled.
Ø Easy
to clean.
Ø Hygienic.
BIO-DIGESTOR TOILET SYSTEM
The anaerobic microorganisms has been painstakingly gathered and examined by DRDO from Antarctica and the productivity of this sytem has been tested by DRDO in extreme atmospheres and conditions like those at Siachen Glacier. The anaerobic microscopic organisms in the bio-architect survive extreme cold and warmth as well as survives when subjected to regularly accessible disinfectants.
Important Dimensions & Volume of Biodigester Tank:
1. Length - 1150 mm 2-Width - 720 mm, 3. Height – 540 mm
4. Total Volume of Tank – 400 lt. 5. Effective Volume of Tank – 300 it.
6. Empty Tank weight – 110 Kg. 7. Full Tank Weight – 410 Kg.
8. Height from Rail level -225 mm
Advantage of IR-DRDO Bio-Digester :
1. No bad smell in toilets from the tanks
2. No infestation of Cockroaches & flies
3. Fecal matter in the tank not visible
4. No clogging of digester
5. Effluent is free from off odour and solid waste
6. No maintenance required
7. Reduction in organic matter by 90%
8. No requirement of adding bacteria/ enzyme
9. No need of removal of solid waste
Here is the Detailed Video For the same By IR-DRDO
Professionally written blogs are rare to find, however I appreciate all the points mentioned here. I also want to include some other writing skills which everyone must aware of.
ReplyDeleteสุขภัณฑ์ ผู้ สูงอายุ
Check all updates for Railway ALP Result like when it comes and how to check it.
ReplyDeleteRRB ALP Result Date
Very informative. I want to get in touch with this enthusiast team. Let's take this hobby to another level where we can create the difference and improve travellers experiences! Pl connect with me at 9987715131
ReplyDeleteThank You for sharing information on bio toilet
ReplyDeleteWe are a gaggle of volunteers and opening a brand new scheme in our community. Your site provided us with valuable info to paintings on. You have done a formidable job and our entire group might be thankful to you.stairwell platform system
ReplyDelete